Loading…
:quality(90)/images.vogel.de/vogelonline/bdb/1337400/1337426/original.jpg)
Southern Power Generation awarded Pöyry an owner's engineer services assignment for a 1,440 MW combined cycle power plant in Pasir Gudang, Johor, Malaysia. The project consists of two 720 MW natural gas-fired combined cycle blocks.
“Southern Power Generation has awarded Pöyry an owner's engineer services assignment for a 1,440 MW combined cycle power plant in Johor, Malaysia.”process-worldwide.com
Summarized from public sources; check the original articles before acting on it.