Loading…

Solaris Energy Infrastructure assumed a turbine supply agreement with Baker Hughes, securing 30 gas turbine generator delivery slots totaling about 500 MW between 2027 and 2029.
“Solaris also assumed a turbine supply agreement, locking in 30 gas turbine generator delivery slots totaling about 500 MW between 2027 and 2029.”tradingview.com
Summarized from public sources; check the original articles before acting on it.