Loading…

Solaris Energy Infrastructure acquired Genco Power Solutions and purchased 30 turbine delivery slots from a private company for a prepayment value of $620 million, adding approximately 900 megawatts of gas turbine installed capacity between 2026 and 2029.
“Solaris Energy Infrastructure announced on Monday that it had reached two agreements with a prepayment value of $620 million, aiming to add approximately 900 megawatts of gas turbine installed capacity between 2026 and 2029.”news.futunn.com
Summarized from public sources; check the original articles before acting on it.