Loading…

ACTOM unveiled a revitalised transformer production and testing facility in Tshwane, South Africa, on December 3, 2025. The 40,000 m² site was acquired from SSPM and will manufacture large Class 3 transformers up to 500 MVA.
“ACTOM has unveiled a revitalised transformer production and testing facility in Tshwane.”engineeringnews.co.za
Summarized from public sources; check the original articles before acting on it.