Loading…
A Bosnian consortium including El Promet, Lager, Ventum Gradnja, GP Gradip, Eko-Euro Tim, Vendom, Građevinski institut, and Naša Banka won a contract to build the Hrgud 60 MW wind farm, including access roads, transmission line and substation, valued at BAM 160.1M (EUR 81.9M).