Loading…
Kerrville Public Utility Board has selected Everllence (MAN Energy Solutions) to supply six 18V51/60G gas engines with a total capacity of 124 MW for a peak-load power plant in Texas. Engines are scheduled for delivery in mid-2026, with operation starting in 2027.
MAN Energy Solutions will supply six 18V51/60G gas engines with a total capacity of 124 MW to a peak-load power plant in Texas for the Kerrville Public Utility Board (KPUB).