Loading…
Nidec Asi was awarded a contract by the Eastern Adriatic Sea Port Authority to design and install shore-to-ship power systems for piers V and VII at the Port of Trieste, Italy. The systems will provide 3.5 MVA and 7.5 MVA respectively, with completion by Q2 and Q3 2024.