Loading…
Machine-Building Factory of Podolsk (ZiO Group) signed a contract with GEH Engineering LLC to supply two heat-recovery boilers for a 330 MW thermal power plant in Chulman, Yakutia. The contract was signed in September 2023, with delivery by April 2025.