Loading…
Thai MMA Co., Ltd. under SCGC signed a design and construction contract with TTCL Plc. for a new methacrylic acid production unit (MAA#3) to increase annual capacity by 10,000 tons. Construction begins in 2023, with commercial operation planned for August 2024.
Doosan Škoda Power will supply a 20MW steam turbine generator for a 74MW steam-gas cycle power plant in Rayong province, Thailand, its first contract in the country. The plant is scheduled to launch operation in January 2024.
TTCL received a construction contract from NatureWorks Asia Pacific for a biopolymer plant (Sequoia Project) in Nakhon Sawan, Thailand, valued at 3.4 billion baht, with a construction period of about 28 months.