Siemens Gas and Power was selected to supply compression equipment and power generation equipment for the Balikpapan refinery in East Kalimantan, operated by Pertamina, as part of the RDMP expansion. The package includes 17 reciprocating compressors, four SGT-800 gas turbines and five SST-600 steam turbines.
Siemens Gas and Power will supply 17 reciprocating compressors, four SGT-800 gas turbines and five SST-600 steam turbines for the Balikpapan refinery expansion owned by PT Pertamina in East Kalimantan, Indonesia. Installation is slated for 2022.
Siemens Gas and Power will supply 17 reciprocating compressors, gas turbines, steam turbines and a hot gas expander for the Balikpapan Refinery in East Kalimantan, Indonesia, owned by PT Pertamina. The expansion will raise refinery output from 240,000 to 360,000 b/d.
Siemens Gas and Power won a contract from CCZ JV to supply three cryogenic boil-off gas compressor trains for the Golden Pass LNG export terminal in Sabine Pass, Texas, with each package driven by a 6.8 MW electric motor.
Siemens Gas and Power won a contract to supply two SGT-400 gas turbine compression packages totaling 39,000 horsepower for an expansion of Midcoast Energy's CJ Express pipeline at an existing compression station in east Texas.