Loading…
Tsengazar LLC signed a contract on September 8, 2021, with Sinoma Building Materials Design Institute of CNBM Group to supply design, drawings, and equipment for a raw lime plant in Mongolia. The lime plant is expected to be operational in Q2 2022, and a cement plant in 2023.