Loading…

Tsengazar LLC signed a contract on September 8, 2021, with Sinoma Building Materials Design Institute of CNBM Group to supply design, drawings, and equipment for a raw lime plant in Mongolia. The lime plant is expected to be operational in Q2 2022, and a cement plant in 2023.
“The lime plant will be operational in the second quarter of 2022, and the cement plant will be operational in 2023.”old.maxgroup.mn
Summarized from public sources; check the original articles before acting on it.