Capstone Turbine received an order for an 800 kW C800S microturbine to upgrade the City of Roseville, California wastewater treatment plant. The order was secured by Cal Microturbine, Capstone's exclusive distributor.
Capstone Turbine Corporation announced it has secured an order from Horizon Power for two new C200 Signature Series units with integrated heat recovery modules, capable of generating up to 300kW of hot water heat recovery in addition to 200kW of electrical output.
Capstone Turbine Corporation secured a 9-year Factory Protection Plan aftermarket service contract renewal from a European customer for fourteen C60 microturbines at a paper mill in northern France. The contract runs through September 2027.
Capstone Turbine secured multiple Factory Protection Plan long-term service contracts covering 2.4 MW for two C200 microturbines and two C1000 systems at oil and gas locations in the Appalachian Basin, bringing total FPP coverage with the customer to 9.3 MW.