Loading…
Capstone Turbine secured multiple Factory Protection Plan long-term service contracts covering 2.4 MW for two C200 microturbines and two C1000 systems at oil and gas locations in the Appalachian Basin, bringing total FPP coverage with the customer to 9.3 MW.
“Capstone Turbine Corporation announced today that it has secured multiple significant Factory Protection Plan (FPP) aftermarket long-term service contracts as follow-on orders to the 6.9 megawatt (MW) multimillion-dollar contract signed back in early January 2018.”einpresswire.com
Summarized from public sources; check the original articles before acting on it.