Técnicas Reunidas has been awarded detailed engineering, procurement and equipment supply to electrify large machinery at Repsol's Sines (Portugal) and Tarragona (Spain) complexes. The work replaces ethylene and propylene compressor turbines with electric motors and is meant to cut CO2 emissions by 260,000 tonnes per year.
Maire Tecnimont subsidiary Tecnimont won a lump-sum turnkey contract from Repsol worth about €430 million to build polypropylene and linear polyethylene units at Repsol's Sines complex in Portugal, due for completion by 2025.
Nortek received a second order, in cooperation with Sacyr Fluor, to renew the turbine and compressor lubrication system at Repsol's Tarragona complex. The system will use two pumps driven by an electric motor and a steam turbine, at a flow rate of 1,160 lpm.
Nortek received an order to supply API lubrication and cooling systems for a boiler feed water pump at Repsol's Tarragona industrial complex, to be supplied to Flowserve. The announcement was dated 2 April 2018.
Aker Solutions won an order from Maersk Drilling to modify the production module on the Maersk Inspirer jackup rig for Repsol's Yme oilfield offshore Norway. The order is valued at about NOK 1 billion and work runs until the end of 2019.