Bolloré Transport and Logistics plans to invest EUR400 million ($491.6 million) to build a second container terminal at the Port of Abidjan, Ivory Coast. Construction will begin in June or July 2019, with operations starting from June 2020.
Hans Künz GmbH and Conductix-Wampfler will supply 32 automatic stacking cranes (ASCs) for a new terminal of APM Terminals at the container port in Tangier, Morocco. Conductix-Wampfler will provide its High Dynamic SMART Drive motor driven cable reels.
APM Terminals Gothenburg signed an addendum to invest an additional US$27 million through 2024 to increase operational productivity, improve gate access and enhance rail services at the Port of Gothenburg.
Siemens received an order from ZPMC to supply electrical and automation systems for 32 automated stacking cranes and 12 remote-controlled ship-to-shore cranes at APM Terminals MedPort Tangier in Morocco. The terminal is to open in 2019.
APM Terminals placed an order with Hans Künz for 32 automated stacking cranes for its Tanger-Med II automated facility, with delivery during 2017 and 2018.
| Site | Largest | Latest |
|---|---|---|
| Gothenburg, Sweden | $27.0M | 2017-03-13 |