Equinor and partners' Vigdis subsea pump boosting station, a NOK 1.4 billion project awarded to OneSubsea, came on stream in May 2021 and is expected to add around 16 million barrels of oil.
Dante Valve Co. will invest $1.9 million to expand its Ballentine Boulevard facility in Norfolk, Virginia by 10,000 square feet and add 40 jobs. The company makes pressure-relief valves, mainly for naval vessels.
Blackmer plans to demolish a dormant foundry building and construct 55,000 sq ft of manufacturing space at its Grand Rapids site, with a total project investment of about $7.4 million and 54 new full-time jobs. The company is seeking a tax exemption that the city commission will consider April 27.
Bürkert is investing 15 million euros to extend its production site in Triembach-au-Val, France, including a new production laboratory, offices and logistics hall, with about 20 hires planned within 36 months.
Corken Inc. will expand its Oklahoma City facility and relocate operations from Chicago, consolidating with Liquid Controls under the name Advance Flow Solutions. The plan creates 120 jobs over five years and seeks an incentive of up to $300,000 from the city.
Sundyne expanded its manufacturing and testing facility in Dijon, France by 1,200 square metres, adding space for package assembly and full unit tests on larger machines. The expansion was announced on 2 February 2021.
Netzsch Pumpen & Systeme plans a new production hall with office units at its Waldkraiburg site, consolidating three local plants into a campus. Groundbreaking was planned for the first quarter of 2021.
Valve maker Didtek has built a new 3,900 square metre factory to expand production of gate, globe and check valves, to meet rising demand. Contagas, its distributor, reported it on 10 December 2020.
PRECISION has completed the expansion of its production facility in Thailand, adding 2,350 square meters to increase production of valve and injection-molded parts and provide additional warehouse space.
AO Zavod im. Gadzhieva plans to spend 600 million rubles on technical re-equipment and expansion of its blank production in Makhachkala, Dagestan, with 213.18 million rubles spent so far and 570 jobs planned, of which 95 have been created.
GEA will invest around EUR 30 million to expand its Koszalin, Poland plant into a center of competence for pump production and comprehensive machining, as part of optimising its production network.
Bosch will invest nearly $6 million to expand its Albion, Indiana facility by over 100,000 square feet for added manufacturing equipment and warehousing, adding 16 jobs. Work is expected to be complete by June 2021.
Yamada, a Honda supplier, plans a $15.2 million expansion adding 73,000 square feet and 100 new jobs at its South Charleston, Ohio facility. Clark County approved a 15-year property tax abatement for the project.
Swagelok completed a 7,400 square meter manufacturing expansion at its Changshu, China facility, doubling its size and adding local jobs. The company also opened a regional office in Singapore for its Asia-Pacific business.
Oerlikon Barmag held the topping-out ceremony for a new approximately 4,000 m2 pump manufacturing building at its Remscheid Lennep site. About 80 employees will move in from December 2020 with 40 machine tools.
Dresser Al-Rushaid Valve and Instrument Co (Darvico) plans a 20,000 sq ft expansion at its Jubail facility in Saudi Arabia, including the first boiler plant in the Middle East for testing valves on steam, due operational by end of 2020.
Trillium Flow Technologies is moving its Salt Lake City, Utah facility operations to Fresno, California, making Fresno the headquarters and center of excellence for its North American pump business. The move is expected to generate over 50 additional jobs within five years.
Alfa Fluid Control began building phase two of its operations, including a smart valve manufacturing workshop of about 3,900 square metres and a 5,200 square metre office, R&D and quality building. The roughly 50 million yuan project is planned for completion in November 2020.
Turkey's industry minister said Bosch will invest an additional 500 million lira at its Bursa plant to start producing next-generation high-pressure pumps, adding 292 jobs. The government's project support decision was published in the Official Gazette.
Oliver Valves has bought three units totalling 17,387 sq ft on the Parkgate Industrial Estate in Knutsford to expand its instrumentation, sub-sea and pipeline valve range. Completion of the new buildings is scheduled for September 2020.
Oerlikon Barmag broke ground in Remscheid Lennep, Germany, on February 25, 2020, for a roughly 4,000 m² extension to its Pump Construction division. The investment is in the high single-digit million-euro range, with completion planned by December 2020.
Oliver Valvetek is constructing three new factory and office buildings on Parkgate Industrial Estate in Knutsford, UK, raising its holdings there from eight to 11 units, with completion due September 2020.
Danfoss Group will build a new 10,000 m² hall at its Grodzisk Mazowiecki plant, moving solenoid valve production from Kolding, Denmark. First lines start in early 2021 and about 330 jobs are expected.
LVF S.p.A. is expanding its production site in Via Mazzini, San Paolo d'Argon, Italy, adding 4,805 square metres of covered area for a total of 11,245 square metres. Fibedil Srl was awarded the construction works.
Rotork is expanding its Mile Crossing Blvd. facility in the Town of Gates, Monroe County, New York, adding 52,000 square feet and up to 56 new jobs over five years in a $10 million project supported by up to $550,000 in state incentives. Completion is expected in summer 2020.
Darvico (Dresser Al-Rushaid Valve and Instrument Co) is expanding its Jubail facility by about 20,000 sq ft to install a boiler plant for testing valves on steam application, the first of its kind in the Middle East. The expansion is due to be operational by mid-2020.
Emerson Automation Solutions broke ground on an expansion of its Park Avenue West plant in Ontario, Ohio, to increase production of rotary vane valves and add an electro-hydraulic operator valve line. The expansion is expected to add 20 jobs over five years.
Ideal Standard Vidima officially opened its modernized sanitary fittings plant in Sevlievo, Bulgaria, the result of a three-year investment program of over BGN 62 million. The plant is described as the largest of its kind in Europe.
Emerson Process Management will expand its Ontario, Ohio facility with a $6.5 million project adding about 12,600 square feet of manufacturing space for its rotary vane and electro-hydraulic operator lines. The expansion is expected to add 20 jobs and take 15 to 16 months to complete.
RegO, a maker of valves and controls for propane and LNG, is expanding its Whitsett, North Carolina manufacturing facility with new automated machining stations, adding about 50 jobs. The machines will be installed over eight months and roughly double plant capacity.
VAT Group completed Phase 2 of its Malaysian campus in September 2019, expanding it from 6,000 to 24,000 square metres, a step forecast to raise global production capacity by 30%.
Desmi Pumping Technology A/S has extended its production capacity and can now manufacture more than 25,000 pumps per year, according to a report published on 2019-09-01.
Nikkiso plans to move industrial and aerospace production from its Higashimurayama plant to its Miyazaki plant, investing about 9.5 billion yen to expand capacity there, with about 100 new jobs. Completion is planned by 2021.
Danfoss Mexico has expanded operations at its Apodaca plant by installing a production line for industrial refrigeration valves, previously imported mostly from China. The investment amount was not disclosed.
Grundfos Canada broke ground on a roughly C$3.5 million expansion of its Oakville, Ontario facility, roughly doubling it to 48,000 sq ft for warehousing and service. Completion is scheduled for July 2020.
Grundfos Canada plans a $3.5 million expansion of its Oakville service and warehouse location, doubling its size to 2,221 sq. m. Construction starts in July 2019 and is scheduled for completion by July 2020.
Haltec Corporation held a groundbreaking for a 59,000-square-foot manufacturing facility in the Leetonia World Trade Park, Ohio, expected to open early next year and add 30 to 40 jobs within three years.
Flomatic Corporation completed a $3.3 million expansion of its Glens Falls, Warren County plant, adding nearly 20,000 sq ft and an epoxy coating operation that nearly triples output. The company has committed to 15 new jobs.
Udmurtia oil and gas equipment maker Technovek plans to expand its foundry section in Votkinsk with a 297 million ruble project, of which 146 million rubles may come as a concessional loan from the Fund for Industrial Development. The upgrade aims to raise monthly output of gate valves and fountain fittings and to boost exports by 202% by 2023.
Evoguard GmbH, a Krones subsidiary, broke ground on an expansion of its Nittenau plant to add about 2,000 m2 of production hall and office space for pumps and valves. Completion is planned for October 2019.
The Weir Group is investing an additional $15 million in its Newton manufacturing facility in Mississippi as part of a total $50 million plan supporting 150 jobs at the plant.
Fluid-power distributor Iowa Fluid Power plans a 45,000 sq ft expansion of its Blairs Ferry Road NE facility in Cedar Rapids, Iowa, valued at $5.7 million, with 12 new jobs and completion expected in August 2019.
Zwick Armaturen GmbH increased its capacity by adding 2,500 square meters to its approximately 20,000 square meter headquarters and main production site in Ennepetal, Germany.
Hydra-Tech Pumps, which builds hydraulically driven submersible pumps in Nesquehoning, Pennsylvania, plans a 10,000-square-foot addition to its 17,000-square-foot manufacturing space in the spring of 2019 and expects to add employees.
UNP Polyvalves is nearly finished adding 50,000 square feet of manufacturing space at its Vadodara, Gujarat plant, bringing total factory space to 150,000 square feet for lined valves.
Bürkert Fluid Control Systems broke ground on 3 December 2018 for an extension at its Menden site, doubling production and office space to about 5,500 m2 within a year. The system house will grow from 52 to 80 staff over the next six to eight years.
Emerson's Metran industrial group will build a second phase of its Chelyabinsk production complex, adding about 20,000 square meters for a total site of 50,000 square meters, with completion planned by the end of 2020. The first phase had an investment of $40 million, and the second-phase investment amount was not disclosed.
Edwards, part of Atlas Copco, opened phase two of its Qingdao, Shandong manufacturing plant on October 23, 2018, with a $65 million expansion focused on semiconductor vacuum pumps.
Weir Minerals completed moving Delta Industrial valve manufacturing into its St Louis, Missouri facility, adding 5,000 sq ft of manufacturing space, 15,000 sq ft of warehouse space and extra shifts and staff.
Anhui Tunxi High Pressure Valve Co. received approval for its adjusted plan to produce 200,000 industrial forged steel valves per year, which involves expanding its production plant, adding a valve cover line and a smart warehouse. The project has entered formal implementation.