Loading…

DL E&C installed the Loop Reactor at the Golden Triangle Polymers Project site in Orange County, Texas, USA. The project is a joint venture between Chevron Phillips Chemical and Qatar Energy to build a 2 million tonnes per year high-density polyethylene plant, scheduled for completion in 2026.
“DL E&C announced on the 6th that it has installed the core equipment, the 'Loop Reactor,' at the 'Golden Triangle Polymers Project (GTPP)' site in Orange County, Texas, USA.”asiae.co.kr
Summarized from public sources; check the original articles before acting on it.