Loading…

GE Vernova secured an order from Sepco 3 to supply six 7HA.03 and two 7E.03 gas turbines for the Taiba 1 and Qassim 1 IPP projects in Saudi Arabia, with a total combined capacity of 3,800MW. It also signed a 21-year service agreement with Nomac.
“GE Vernova has secured an order for six 7HA.03 gas turbines and two 7E.03 gas turbines for two upcoming power plants in Saudi Arabia with a total combined capacity of 3,800MW.”meed.com
Summarized from public sources; check the original articles before acting on it.