Loading…

Sarens has been contracted by Samsung Saudi Arabia to transport and install 34 modules (total 18,535 tons) and transport and lift 108 heavy items (total 12,283 tons) for the Jafurah Gas Plant Project in Saudi Arabia.
“Sarens has secured a contract for the transportation and installation of 34 modules, totalling 18,535 tons in weight, as well as the transportation and lifting of 108 heavy items.”oilandgasmiddleeast.com
Summarized from public sources; check the original articles before acting on it.