Loading…

Lilama, the main constructor of the Vung Ang II thermal power plant in Vietnam, has contracted Sarens for the lifting and installation of two boilers, with heaviest loads up to 77 tons. The plant is expected to come on stream in 2024.
“Lilama, the main constructor of the project, has requested Sarens' collaboration for the lifting and installation of the two boilers of the plant.”sarens.prowly.com
Summarized from public sources; check the original articles before acting on it.