Loading…

Doosan Enerbility signed a 280 billion won ($209.6 million) contract with Korea Southern Power Co. to supply a gas turbine, steam turbine and heat recovery steam generator for a combined cycle power plant in Andong, South Korea. The plant is expected to be completed in December 2026.
“We plan to expand the collaboration to long-term gas turbine maintenance service to enhance the domestic gas turbine industry's capabilities in all fields and actively seek an entry into the global market.”kedglobal.com
Summarized from public sources; check the original articles before acting on it.