Loading…

Doosan Enerbility signed a 280 billion won ($2.1 billion) contract with Korea Southern Power Co. to supply main equipment including a 380MW H-class gas turbine, steam turbine, and HRSG for Unit 2 of the Andong combined cycle power plant in Andong, Gyeongsangbuk-do, South Korea. The plant is scheduled for completion in December 2026.
“두산에너빌리티는 한국남부발전과 2800억 원 규모의 안동복합발전소 2호기 주기기 공급계약을 체결했다고 밝혔다.”mk.co.kr
Summarized from public sources; check the original articles before acting on it.