Loading…
voestalpine placed an order with Primetals Technologies for a 180-ton EAF Ultimate electric arc furnace with an annual capacity of 1.6 million tons of liquid steel for its site in Linz, Austria. Startup is scheduled for 2027.
“We are very happy to strengthen our close and long-lasting partnership with voestalpine and to support them on their way to becoming CO2-neutral.”globenewswire.com
Summarized from public sources; check the original articles before acting on it.