Loading…
Eastern Green Link 1 Ltd awarded a £750m contract to Prysmian Group for 400km of power cable and a £1bn contract to GE Vernova and MYTILINEOS for two HVDC converter stations. The contracts were announced on December 12, 2023.
“These contract awards are a major milestone for the project, with the design phase commencing in 2024 and construction in 2025.”nationalgrid.com
Summarized from public sources; check the original articles before acting on it.