Loading…

Prysmian finalized a contract worth about €1.9 billion with Eastern Green Link 2 Limited to deliver a 525 kV HVDC cable system connecting Scotland and England, with 2 GW capacity. The project is due to be operational in 2029.
“We are very proud to have the opportunity to play our role in the development of such a strategic infrastructure for UK, by making available our state-of-the-art cable technology”prysmian.com
Summarized from public sources; check the original articles before acting on it.