Loading…
Riyadh Cement Company has signed a 130.5 million Saudi riyal ($34.8 million) contract with Sinoma Energy Conservation Limited to build a waste heat recovery plant with a capacity of 12.64 MW.
“Riyadh Cement Company has signed a 130.5 million Saudi riyal ($34.8 million) contract with Sinoma Energy Conservation Limited to establish a waste heat recovery plant with a 12.64 megawatts (MW) capacity.”zawya.com
Summarized from public sources; check the original articles before acting on it.