Loading…
Rusatom Infrastructure Solutions (part of Rosatom) is modernizing the Severskaya CHPP in Seversk, Russia, with a total investment of nearly 9 billion rubles. A new 60-ton boiler drum from Barnaul Boiler Plant has arrived, and the project includes reconstruction of 10 boilers and installation of two new steam turbines, to be completed by 2026.
“Проект планируется завершить к 2026 году.”rir.rosatom.ru
Summarized from public sources; check the original articles before acting on it.