Loading…

Nucor Steel Berkeley placed an order with Primetals Technologies for a new automotive-grade continuous galvanizing line at its Huger, South Carolina facility. The line will have an annual capacity of about 500,000 tons and is expected to produce the first coil by mid-2025.
“Nucor Steel Berkeley expects to produce the first coil by mid-2025.”thefabricator.com
Summarized from public sources; check the original articles before acting on it.