Loading…

Shenyang Xinghua Aviation Electric Co., Ltd. has launched an EPC project for a new 38,500 square meter assembly plant to increase production capacity for aircraft engine wire harnesses and small fans, with a contract value of CNY 198.7 million. The project is scheduled from January 31, 2023 to November 1, 2024.
“新建707综合装配厂房,总建筑面积38500平方米;新增装配调试、试验验证、质量保障、信息化等工艺设备共计75台(套),主要用于建设发动机电缆数字化装配线、飞机特种电缆装配数字化生产线等生产条件建设。”bidcenter.com.cn
Summarized from public sources; check the original articles before acting on it.