Loading…
GE Grid Solutions signed a turnkey contract with TransnetBW to redesign and expand the Pulverdingen 380 kV substation near Stuttgart, Germany, including 26 bays of 380 kV air-insulated switchgear. Construction is expected to take until end of 2033.
“The Pulverdingen substation will strengthen the security of power supply in the Stuttgart area in the long term.”gevernova.com
Summarized from public sources; check the original articles before acting on it.