Loading…

NIBE has received a letter of award from Goa Shipyard for supplying mild steel and high tensile steel plates for a floating dock, with a total consideration of Rs 25.18 crore. The contract is to be executed by 14 February 2023.
“NIBE has received letter of award dated 6 December 2022 from Goa Shipyard for supplying mild steel and high tensile steel plates with shot blasting and priming for main hull and superstructure of floating dock.”business-standard.com
Summarized from public sources; check the original articles before acting on it.