Loading…
AD MEPSO awarded a contract to Končar - Power Plant and Electric Traction Engineering Inc. for the supply and installation of the 400/110 kV Ohrid Substation and extension of Bitola 2 Substation, valued at EUR 16,955,206.42.
“Contract to be funded from part of the proceeds of the loan: MEPSO: Macedonia - Albania Transmission Phase 1”ecepp.ebrd.com
Summarized from public sources; check the original articles before acting on it.