Loading…
Mitsubishi Heavy Industries signed an MOU with Taiwan Power Company to conduct a study on introducing ammonia co-firing at the Linkou Thermal Power Plant. Phase 1 through 2025 will be a basic study for 5% ammonia co-firing, with a goal of 5% co-firing by 2028-2030.
“The aim is to reduce coal consumption in line with TPC’s project to achieve its energy supply composition targets, in response to the global trend toward reducing CO2 emissions and a shift in Taiwan’s energy policy.”mhi.com
Summarized from public sources; check the original articles before acting on it.