Loading…

VEO has signed an EPC contract with Glitre Energi Produksjon AS to build a hybrid power plant, Brakerøya Energisentral, at the new Drammen Hospital in Norway. The plant will combine battery sets, gensets, and solar power to provide emergency power within 0.5 seconds.
“This is a very interesting project for VEO, not only because of its scope and great complexity but also because of the required extremely short response time in emergency situations.”veo.fi
Summarized from public sources; check the original articles before acting on it.