Loading…
Nexans has been awarded a turnkey contract by TenneT for the manufacturing and installation of 235 km of 320 kV DC subsea and land cables for the BorWin 6 offshore wind connection in the German North Sea. The project will transmit 980 MW and is expected to start operations in 2027.
“Nexans has been awarded a turnkey contract for the manufacturing and installation of the record length direct current (DC) subsea and land cables for BorWin 6 by TenneT.”nexans.com
Summarized from public sources; check the original articles before acting on it.