Komatsu Mining ramps up production at new $285M Milwaukee plant
Komatsu Mining is ramping up production at its new $285 million campus in Milwaukee's Harbor District. Manufacturing started in March 2022, and an official opening is planned for later in June 2022.
Starts operating
27 Jun 2022
Capacity
430,000 square feet
Productselectric rope shovelshybrid shovelsdraglinesblasthole drillslarge gears
“To physically see what we’ve accomplished here and also see the manufacturing processes actually happening — seeing it in operation — it’s amazing.”spotonwisconsin.com
- 5 sources
- spotonwisconsin.com'It's like nothing else' - Komatsu Mining ramps up production at new $285M Milwaukee plant: Slideshow — Spot On WisconsinJun 8, 2022
- eua.comIt’s like nothing else’ — Komatsu Mining ramps up production at new $285M Milwaukee plant: Slideshow | EUAJun 8, 2022
- urbanmilwaukee.comEyes on Milwaukee: Inside Komatsu Mining’s Massive New Harbor District Campus » Urban MilwaukeeJeramey JanneneJun 27, 2022
- komatsu.jpコマツマイニング(株)新工場で、開所式を実施 | ニュースルーム | コマツ 企業サイトJun 28, 2022
- ocepo.comKomatsu Mining Holds Opening Ceremony of New PlantJul 20, 2022
Summarized from public sources; check the original articles before acting on it.