Loading…

Mitsubishi Power and Sepco 3 were awarded a full turnkey contract by Aluminium Bahrain (Alba) to increase the capacity of Power Station 5 by 680.9 MW with a new combined-cycle gas turbine block. Commercial operations are scheduled for Q4 2024.
“We are thrilled to add a fourth block into Power Station 5 to bring its power output to more than 2.4 GW.”transformer-magazine.com
Summarized from public sources; check the original articles before acting on it.