Loading…

SUEZ, through a local joint venture, was awarded a 30-year build-and-operate contract for an industrial wastewater treatment plant in the Changshu Economic and Technological Development Zone. The project has a total investment of over EUR 37 million and a daily treatment capacity of 15,000 m³.
“SUEZ, through a local joint venture, was recently awarded a 30-year, build-and-operate contract for an industrial wastewater treatment plant in Changshu.”suez.com
Summarized from public sources; check the original articles before acting on it.