Loading…

LONGi won a contract to supply 406MW of Hi-MO 5 bifacial modules to SEPCOIII Electric Power Construction Co., Ltd. for the Red Sea Project in Saudi Arabia, a renewable energy-powered tourism development.
“LONGi, China has announced that it has won a contract to supply 406MW of its Hi-MO 5 bifacial modules to SEPCOIII Electric Power Construction Co., Ltd. for Saudi Arabia’s Red Sea Project.”saudigulfprojects.com
Summarized from public sources; check the original articles before acting on it.