Loading…
Doosan Heavy Industries & Construction won a 120 billion won (about $100.6 million) order from PLN to supply CFB boilers and turbines for the 110 MW Palu 3 thermal power plant on Sulawesi, with installation planned by 2023. The deal was announced on 9 September 2019.