Loading…
Bellelli Engineering was awarded an order for detailed shop drawings and fabrication of 17 tons of steel structures for the Arctic LNG project. The project was later canceled due to sanctions.
“Bellelli has delivered the shop drawings for 166 out of the 190 structures and 8 tons of prefabrication.”bellellieng.com
Summarized from public sources; check the original articles before acting on it.