Loading…

Borouge held the ground-breaking ceremony for its $6.2 billion Borouge 4 polyolefin plant in Ruwais, Abu Dhabi, UAE. The plant will produce 1.4 million tonnes of polyethylene annually and is scheduled to be operational by the end of 2025.
“Scheduled to be operational by the end of 2025, the plant will produce 1.4 million tonnes of polyethylene.”borealisgroup.com
Summarized from public sources; check the original articles before acting on it.