Loading…

GEA secured its third contract from food manufacturer Pol's to deliver and install a RAY 125 freeze dryer at Pol's facility in Ermenek, Karaman, Turkey. The new equipment will increase freeze drying output from 200 to 300 tons per year. Handover is expected by mid-2022.
“GEA has secured its third contract from food manufacturer Pol’s to deliver and install RAY freeze drying equipment at the company’s 4,000 m2 fruit and vegetable freeze drying facility in Ermenek, Karaman, Turkey.”foodtechbiz.com
Summarized from public sources; check the original articles before acting on it.