Loading…

Comes SpA, as partner of Ansaldo Energia, was awarded a contract by EnBW for the design, supply, installation and service of a 300 MW open-cycle power plant in Marbach, Germany. The plant will be operational by October 2022. The total contract value is over €100 million.
“The start-up of the Marbach plant and the fruitful cooperation with Ansaldo Energia prove that Comes SPA, with its expertise and products, is a reliable partner at the European level in the energy transition scenario.”comesspa.com
Summarized from public sources; check the original articles before acting on it.