Loading…

GE and SHIPCO switched on a gas turbine at the 1.8 GW Hamriyah independent power plant in Sharjah, UAE. The project is 70% complete and will use three GE 9HA.01 turbines.
“GE delivered the first two GE HA gas turbines for the project.”enerdata.net
Summarized from public sources; check the original articles before acting on it.