Loading…

Wärtsilä received an EPC contract valued at approximately EUR 100 million from Termotesorito to build a 200 MW flexible baseload power plant in Córdoba Province, Colombia. The plant will use 11 Wärtsilä 50SG engines fueled by natural gas.
“The flexibility, reliability and efficiency of the Wärtsilä plant, which can be started and stopped in a matter of minutes and which has a very low water consumption, is exactly what is needed as we integrate more and more renewables into the system.”wartsila.com
Summarized from public sources; check the original articles before acting on it.