Loading…

Linxon will supply a 380 kV GIS substation for TransnetBW in Bühl, Germany, to upgrade and strengthen the 'Badische Rheinschiene' power link. The contract includes design, supply, installation and commissioning.
“Linxon will supply a 380-kilovolt (kV) Gas Insulated Switchgear (GIS) substation for the German transmission system operator TransnetBW in the town of Bühl, southwestern Germany.”news.cision.com
Summarized from public sources; check the original articles before acting on it.