Loading…
Lundin Energy let an EPCI contract to Aker Solutions for integration of a high-voltage electrical boiler package to electrify the Edvard Grieg platform in the North Sea. The work starts immediately and will make the platform fully electrified by 2022.
“Lundin Energy let an engineering, procurement, construction and integration (EPCI) contract to Aker Solutions for the integration of a high-voltage electrical boiler package as part of the electrification of the operator’s Edvard Grieg platform.”ogj.com
Summarized from public sources; check the original articles before acting on it.