Loading…

Liebherr delivered the tenth 1000 EC-H 40 High-Top tower crane to the Grand Paris Express project in France since May 2018. The cranes are used to supply tunnel boring machines with pre-cast tunnel lining segments.
“Since May 2018, there have been ten 1000 EC-H 40 High-Top tower cranes with very high lifting capacities on the construction sites of the Grand Paris Express.”liebherr.com
Summarized from public sources; check the original articles before acting on it.